Type in your line's downtime, output, scrap and energy, move the sliders to set your own improvement targets, and watch today's line and the connected line run side by side. Every formula is on the page.
Live view
The animation speed follows your figures: parts per hour, the share of time stopped and the scrap rate. It is a picture of your inputs, not a measurement.
Your result
–
Add your margin, tariff or maintenance spend to see the value in your currency.
Formula, with your numbers
Free PDF report
Your results stay free on this page. Share a few details and we will prepare a clean, printable report with your baseline, your targets, the before and after figures and every formula.
The short answer
Start from your own month: planned hours, unplanned downtime, good-part rate, scrap and energy. Apply a cautious target to each loss, then compare. Extra good parts = connected good output − today's good output. Value only comes from figures you supply, such as your margin per part, your energy tariff and your maintenance spend, and payback = your investment ÷ net monthly benefit.
Formulas
Run hours = planned hours − unplanned downtime
Connected downtime = downtime × (1 − downtime target)
Good parts = run hours × part rate × (1 − scrap %)
Connected scrap % = scrap % × (1 − scrap target)
Extra good parts = connected good parts − today's good parts
Energy saved = kWh × energy target · Energy per good part = kWh ÷ good parts
Net monthly benefit = extra parts × margin + kWh saved × tariff + maintenance spend × maintenance target − running cost
Payback (months) = one-time investment ÷ net monthly benefit
Worked example
The example line runs 400 planned hours a month with 40 hours of unplanned downtime, makes 120 parts an hour and scraps 4%. With planning targets of 10% less downtime and 10% less scrap:
| Step | Working | Result |
|---|---|---|
| Today's run hours | 400 − 40 | 360 h |
| Today's good parts | 360 × 120 × 0.96 | 41,472 |
| Connected downtime | 40 × 0.90 | 36 h |
| Connected scrap | 4% × 0.90 | 3.6% |
| Connected good parts | 364 × 120 × 0.964 | 42,107.52 |
| Extra good parts | 42,107.52 − 41,472 | ≈ 636 / month |
These are the example figures loaded above. Replace them with your own line to get your answer.
FAQ
It is a planning tool that compares your production line today with the same line after connecting machines and sensors. You enter your own downtime, output, scrap and energy figures, set improvement targets, and see the difference in parts, hours, energy and, if you add your costs, money.
Results depend on the machine, the process and how the data is used, so a single typical figure would mislead. The sliders let you test cautious and ambitious targets for your own line. A short pilot on one machine is the most reliable way to set them.
Use your shift logs, maintenance records or production reports for one month and add up every unplanned stop. If you have no records yet, a machine monitoring system can capture stops and reasons automatically from the first day.
Payback in months is your one-time investment divided by the net monthly benefit. Net benefit is the margin on extra good parts plus energy and maintenance savings, minus any monthly running cost you enter. The simulator never fills in an investment figure for you.
Yes. Older machines can be retrofitted with current sensors, vibration or temperature sensors and a gateway, so run, idle and stop states are captured without changing the machine's controls.
No. The calculations run in your browser. Figures are only saved if you choose to request the PDF report, together with the contact details you enter.
Keep reading
Tech4LYF has delivered 860+ projects since 2017 across custom software, Odoo ERP and Industrial IoT. Our Chennai team connects machines, captures every stop and shows downtime, scrap and energy live, so you can track your targets for real.
Or write to [email protected] or call +91 86086 07392
No spam. No pressure. Just a quick discovery call with our experts.