Enter one shift, day or week of data. Results update as you type. The example figures are a classic textbook shift; replace them with yours.

Time
minutes
Shift length minus planned breaks. Example: 480 − 60 = 420.
min
Unplanned stops
min
Changeovers, warm-up
Speed and count
sec / piece
Fastest possible time per piece
min
Short stops under ~5 min
pieces
pieces
pieces
Rejects made while warming up after a setup. The rest count as production rejects.
Value of the loss (optional)
Margin or sale value, your choice.
per month

Your result

Overall Equipment Effectiveness

–OEE
–
Availability
–
Performance
–
Quality

–

Run time–
Fully productive time–
Pieces lost to all losses–
Track OEE live

Six big losses

The six big losses: where your planned time goes

Every minute of planned production time ends up either as fully productive time or as one of the six big losses. The biggest bar is usually the best place to start.

The short answer

How do you calculate OEE?

OEE = Availability × Performance × Quality. Availability is run time divided by planned production time, performance is ideal cycle time × total count divided by run time, and quality is good count divided by total count. The same answer comes from good count × ideal cycle time ÷ planned production time.

Formula

OEE formula: Availability × Performance × Quality

Run time = planned production time − downtime (breakdowns + setups) Availability = run time ÷ planned production time Performance = (ideal cycle time × total count) ÷ run time Quality = good count ÷ total count OEE = Availability × Performance × Quality = (good count × ideal cycle time) ÷ planned production time

The six big losses

  • Availability losses: breakdowns (unplanned stops) and setups and adjustments (changeovers).
  • Performance losses: small stops and slow cycles. Slow cycles are the performance loss left after small stops.
  • Quality losses: production rejects and startup rejects, counted as the time it took to make them.

Worked example

OEE calculation example: one shift, worked through

A 480-minute shift has two 15-minute breaks and a 30-minute meal break, leaving 420 minutes of planned production time. The machine stops for 47 minutes (27 breakdowns, 20 setups). Its ideal cycle time is 1 second, it makes 19,271 pieces and 18,848 are good.

FactorWorkingResult
Run time420 − 47373 min
Availability373 ÷ 42088.81%
Performance(1 s × 19,271) ÷ (373 × 60 s)86.11%
Quality18,848 ÷ 19,27197.80%
OEE0.8881 × 0.8611 × 0.978074.79%

Check: 18,848 good pieces × 1 s ÷ 25,200 s of planned time = 74.79%. These are the example figures loaded in the calculator above.

FAQ

OEE calculation FAQ

What is OEE?

OEE (Overall Equipment Effectiveness) measures how much of your planned production time is truly productive: making only good parts, as fast as possible, with no stops. 100% OEE means perfect production.

What is a good OEE score?

85% is widely quoted as world-class OEE for discrete manufacturing, a mark that traces back to Seiichi Nakajima's work on Total Productive Maintenance. The most useful comparison, though, is your own trend over time on the same machine or line.

How do you calculate OEE in Excel?

Put planned time, downtime, ideal cycle time, total count and good count in columns, then add three formula columns: availability = (planned − downtime) / planned, performance = ideal cycle time × total count / run time, quality = good / total. OEE is the product of the three. This calculator applies the same formulas instantly.

Can performance be more than 100%?

No. If it is, the ideal cycle time is set too slow, or the count includes pieces from outside the period. The calculator flags this so you can correct the input.

Should planned breaks count as downtime?

No. Planned breaks are removed before OEE starts, which is why the calculation uses planned production time. Breakdowns and setups during that time are availability losses.

What is the difference between OEE and TEEP?

OEE measures losses against planned production time. TEEP (Total Effective Equipment Performance) measures against all calendar time, so it also shows how much time is not scheduled at all.

How can I track OEE automatically?

Connecting machines through PLCs, sensors or IoT gateways lets you capture run time, stops and counts automatically, with reasons for each stop. That removes manual entry and shows OEE live on a dashboard for every shift.

Keep reading

Related guides and services

From OEE calculator to live OEE software

Tech4LYF has delivered 860+ projects since 2017 across custom software, Odoo ERP and Industrial IoT. Our Chennai team connects machines and builds OEE software and dashboards that capture stops, reasons and counts automatically, every shift.

Or write to [email protected] or call +91 86086 07392

Trusted By Industry Leaders

Zealeye Logo
Zealeye Logo
Zealeye Logo
Zealeye Logo
Zealeye Logo
Zealeye Logo
Zealeye Logo
Zealeye Logo
Annai Printers Logo
Deejos Logo
DICS Logo
ICICI Bank Logo
IORTA Logo
Panuval Logo
Paradigm Logo
Quicup Logo
SPCET Logo
SRM Logo
Thejo Logo
Trilok Logo
Wingo Logo
Zealeye Logo
Scroll