A two-minute shift
You are the plant head for one shift: four machines, a target of 480 parts, and the same breakdowns twice. First with walks and phone calls, then with live machine data. See how far each one gets you.
You only know what you see on a floor walk, or what an operator calls in to tell you, usually well after it happened. Click a stopped machine to send help. A floor walk takes 20 minutes of your shift.
06:00 to 14:00 plays in about a minute. You can pause any time.
Shift result
Scorecard PDF
Your result is above either way. Leave your details for a printable scorecard, and if you like, a short call about what live machine data would change in your plant.
What the game shows
A machine that stops at 07:35 and gets reported at 08:35 has already lost an hour before anyone moves. Live status cuts that wait to nothing.
Rising vibration or temperature gives a window to plan a short stop instead of waiting for a long breakdown.
When stores can see consumption, reorders go out before the bar stock runs dry at the machine.
FAQ
No. The machines, rates and breakdowns are a made-up example so the two rounds can be compared fairly. Both rounds use exactly the same events.
Sensors or a PLC connection report each machine's state every few seconds, so the plant head sees stops and warnings on a phone or a shop-floor screen as they happen.
Yes. Clip-on current sensors read running, idle and stopped states on most machines without changing their wiring or PLC.
No. The game runs in your browser. Nothing is sent unless you ask for the scorecard and fill in the form.
Related
No spam. No pressure. Just a quick discovery call with our experts.